
(4)

ELECTRICAL UPGRADE
While the bedroom windows were being installed,
electricians continued
the
upgrade of the house wiring from 120 to 220 volts.
Below, Carlos worked
on the junction box and all its wires,
which, indeed, are twice the
size of the previous hardware.


UPSTAIRS BATHROOM
(with apologies to the
Beatles...)





Teddy-Toku shower curtain will be used in the
refurbished
bathroom (that is to say, there won't be a glass door on
the new bath tub with shower)
UPSTAIRS SPARE ROOM

%20Window.jpg)
KITCHEN
1. SLIDING DOOR



2. Casement windows over sink



.jpg)
May 15, 2019
Two New Windows in Blue Room - Late Afternoon
.jpg)
%20afternoon.jpg)
AT NIGHT
%20(O5151299).jpg)
%20O5151301.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
ONE NEW LIVING ROOM WINDOW
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
%2002.jpg)